Bid leveling for general contractors

The low bid is not always the cheapest. Find the missing scope before you award.

Rules put every sub bid on one bid tab, line by line.AI reads the proposals: inclusions, exclusions, qualifications.Your estimator levels, decides and awards.

Send one bid package you have already bought out. You get the leveled bid tab and the scope gaps it found. It is free.

How it looks today

Sub bids arrive in six formats. Leveling them is still done by hand.

01 · Retyping

Every sub proposal is retyped from a PDF into an Excel bid tab.

02 · Retyping

Each sub breaks the scope down differently, so the lines do not match up.

03 · Missed scope

Exclusions sit in the fine print on page three, and get missed.

04 · Missed scope

The low number wins. The missing scope comes back as a change order.

How we sort the work

Three kinds of step. Each one gets the right tool.

Most of bid leveling does not need AI. It needs the same comparison done the same way every time. AI is for the parts that need reading.

A rule does it

Steps with one right answer

The same bids give the same bid tab, every time. No AI is involved.

  • Putting every bid on one scope sheet
  • Matching line items across subs
  • Adding up base bid, alternates and allowances
  • Checking license, insurance and bond dates

Automated with fixed rules.

AI does it

Steps that need reading

Set up once, so every package is read the same way. Not a chat window, one proposal at a time.

  • Reading PDF and emailed proposals
  • Pulling out inclusions and exclusions
  • Finding “by others” and qualification notes
  • Comparing each bid against your scope sheet

AI proposes, and shows the page it relied on.

This is where your estimator's time should go
A person does it

Steps that need judgment

These stay with the estimator. The tool brings the evidence and waits.

  • Plug a gap, or send it back to the sub
  • Decide who is truly low
  • Weigh past performance and capacity
  • Award and sign the subcontract

Never automated.

Where to start · Free

The free run: one past package, leveled.

Pick a package you have already bought out. Send the scope sheet and the sub proposals. You get three things back.

1

One bid tab

Every sub on the same lines, in your scope order, with the page each number came from.

2

Scope gaps, flagged

Each exclusion, “by others” note and missing line, listed sub by sub.

3

Adjusted totals

The quoted price next to the price once the gaps are plugged, using your own numbers.

Level one past package freeYou already know how that package turned out. Compare it with what the run catches.

What it handles

Two jobs that sit in front of every award.

Each one takes the retyping and the reading off an estimator's desk and leaves the decisions with a person.

01 · Bid levelingEstimating and preconstruction

Six sub bids, one bid tab, every gap marked.

Bids for one scope arrive as PDFs, spreadsheets and emails. Someone has to make them comparable before bid day.

By hand
  • Open each proposal
  • Retype prices into the bid tab
  • Hunt for exclusions and qualifications
  • Call subs about missing scope
  • Plug numbers and re-total
Automated
  • Reads every proposal as it was sent
  • Maps each price to your scope lines
  • Lists inclusions, exclusions and alternates
  • Marks the lines a sub left out
  • Shows quoted and adjusted totals side by side
A person still decides: plug or query each gap, then choose who to carry.
02 · Contractor vettingPurchasing and risk

Sub paperwork checked before the award, not after.

Before buyout, someone confirms the sub can do the job: license, insurance, safety record and bonding.

By hand
  • Ask for the license, COI and W-9
  • Read each certificate for limits and dates
  • Look up EMR and safety history
  • Check bonding capacity against the package
  • Chase what is missing
Automated
  • Reads the documents the sub sends
  • Checks limits and expiry dates against your requirements
  • Flags what is missing or out of date
  • Builds one prequal summary per sub
  • Reminds you before a certificate lapses
A person still decides: approve, approve with conditions, or decline the sub.

How it behaves

Three rules we do not bend.

01

Reads, never rewrites

The tool reads each proposal as the sub sent it. It does not change a number. Where a bid is silent, it says so. It does not guess.

02

Your estimator awards

Every gap waits for a person to plug it or send it back. Nothing is awarded by the tool.

03

Shows its source

Every figure links to the page it came from, so anyone can check it in seconds.

Is the free run for you?

It is, if

  • You level sub bids on most projects.
  • Proposals arrive as PDFs and get retyped into Excel.
  • A missed exclusion has cost you a change order.

It is not, if

  • You want software to pick the winner.
  • You self-perform most of the work and buy few packages.
  • You bid one or two small jobs a year.

Run one past package. See what it would have caught.

Send a package you have already bought out. You get the bid tab, the scope gaps and the adjusted totals back. Free, and yours to keep.

Or write to contact@cbsol.ai